Cellular Grout Solving Geotechnical Challenges

CGPS with StableAir Solving Geotechnical Challenges Cellular Concrete Grout for: Pipeline abandonment, Annular Space Grouting Tunnel-Load Reducing Backfill CGPS is ready to set up a batching plant on your project-site location to create cellular grout or cellular concrete at the production rate and density your project-engineer specifies. Our computerized central control will test and maintain the required specific cellular material density throughout the entire project. CGPS will calculate the mix design and provide the necessary foaming equipment, foaming agent, and trained certified personnel. Cellular Concrete Grout is lightweight and highly fluid, resulting in the following advantages: Self compacting & self leveling Ability to pump for long distances requires fewer access points and/or lower costs and less disruption Minimal shrinkage Low hydrostatic and buoyant forces acting on carrier pipes Virtually eliminates risk of incomplete filling or plugging of void spaces Extremely flowable and pumpable Stability and strength with minimal weight Lower pumping pressures which reduces the risk of damage to pipe or structure Load reduction (vertical and lateral) Minimizes settlement

Comments Off on Cellular Grout Solving Geotechnical Challenges