Flowable Fill Project – Tampa, FL

FLOWABLE FILL IN TAMPA - PROJECT SPECIFICATIONSLOW DENSITY CELLULAR CONCRETE SPECIFICALLY DESIGNED FOR FOR FILLING ABANDONED PIPES AND STRUCTURES.THE 28-DAY COMPRESSIVE STRENGTH OF THE FLOWABLE FILL SHALL BE MINIMUM OF 40 PSI AND A MAXIMUM OF 100 PSI.RANGE OF CAST DENSITY, 24 TO 30 PCF.THE FLOWABLE FILL IS A CONTROLLED LOW-STRENGTH MATERIAL (CLSM) AND SHALL MEET THE REQUIREMENTS OF ACI 229R (LATEST EDITION).FLOW CONSISTENCY PER ASTM D6107 GREATER THAN 7 INCHES.130 YARDS IN TWO WORKING DAYS CONCRETE PUMP JOBSITE

0 Comments

Flowable Fill Project

Cellular Concrete Grout Production Services 2023 Flowable Fill Project Read about our most recent flowable fill project completed in 2023 that began with a 5:00AM equipment set up time on location. Pipe Abandonment Project Total LNFT of Pipes: 16,672 Total CUYD of Cellular Concrete: 12,548 Cellular Concrete Low Density: AVG. 40 PCF Abandonment Project Completed in: 42 Days Daily Placement of Cellular Concrete: 350 CUYD Independent density test laboratory Computerized central control Cellular concrete equipment ready for mixing Cellular concrete samples for testing

Comments Off on Flowable Fill Project

Cellular Concrete Completed Projects

Cellular Grout Production Services' Completed Projects See how our experienced contractors set up and work on your project site location with a sampling of our completed projects. Retaining wall repair pouring underwater cellular concrete Cellular concrete foam machine dashboard Inside office control center Cellular concrete production system control center View of arm injector system at job site set up Cellular concrete arm injector Cellular concrete arm injector at job site

Comments Off on Cellular Concrete Completed Projects